Changing Project Requirements are Keeping Power Engineers Awake at Night

April 19, 2017
By

Power designers face many technical challenges to meet the demand to provide more power from less space and with higher efficiencies. Despite the difficulty of overcoming these demands, research we conducted recently found that power system developers around the globe perceive the biggest challenge to be changes in specifications for the power system during development.

And our research showed that the situation is actually getting worse, with most engineers believing that changes were becoming more common at the same time that they see the time given to product development reducing.

Complete the form below to download “Spec Changes Top List of Power Designers’ Challenges” This white paper describes the findings from the research in detail, and suggests an approach that reduces the impact of specification changes, allowing engineers to get a good night’s sleep once again.

 

Tags: ,

Leave a Comment

Your email address will not be published. Required fields are marked *

Find out more about our Cool-Power Buck Regulators DCMs - A better Brick subscribe to vicor newsletter Contact Us

Get Connected